UNDERSTAND THE ESTIMATE
Try a checked example
A 4 m² patio needs 210 pieces of 20 × 10 cm pavers after 5% piece allowance. A 10 cm base occupies 0.4 m³; at the assumed 1,800 kg/m³ it weighs 0.72 tonnes. The 3 cm sand layer is 0.12 m³ and 0.18 tonnes at 1,500 kg/m³. Layer depths come from the project, not a pavement design by this tool.
Show all example inputs
| Units | Metric |
|---|---|
| Length (m) | 2 |
| Width (m) | 2 |
| Paver length (cm) | 20 |
| Paver width (cm) | 10 |
| Extra for cuts & waste (%) | 5 |
| Gravel base depth (cm) | 10 |
| Bedding sand depth (cm) | 3 |
| Base gravel bulk density (kg/m³) | 1800 |
| Bedding sand bulk density (kg/m³) | 1500 |
- Pavers including allowance: 210
- Base volume (m³): 0.4
- Sand volume (m³): 0.12
- Base mass (metric tonnes): 0.72
- Sand mass (metric tonnes): 0.18
Illustrative project geometry and stated assumptions; not a product endorsement or construction specification.
Example checked on October 22, 2026. Calculation method and limits.
How to use the paver calculator
- Enter the length and width of the area. For an irregular shape, use the square footage calculator first and enter an equivalent rectangle.
- Enter the paver size. A common brick-shaped paver is 4 × 8 in (about 10 × 20 cm).
- Choose the waste allowance: about 5% for straight or running-bond layouts, and 10–15% for herringbone, diagonal or curved designs.
- Enter the compacted depth of the gravel base and the depth of the sand bed.
The formulas
Pavers = area ÷ (paver length × paver width) × (1 + waste %) Base volume = area × base depth Sand volume = area × sand depth Cubic yards = cubic feet ÷ 27Typical base depths
| Use | Compacted gravel base | Bedding sand |
|---|---|---|
| Patios and walkways | 4–6 in (10–15 cm) | about 1 in (2.5–3 cm) |
| Residential driveways | 8–12 in (20–30 cm) | about 1 in (2.5–3 cm) |
These are common guidelines. Use deeper bases on clay soils and in areas with hard frosts, and follow the paver manufacturer's installation guide.
Worked example
A 12 × 10 ft patio with 4 × 8 in pavers, a 4 in base and 1 in of sand:
- Area: 120 sq ft. Each paver covers 32 sq in, so there are 4.5 pavers per sq ft and 540 pavers. With 5% waste: 567 pavers.
- Base: 120 × 4 ÷ 12 = 40 cu ft = 1.48 yd³, about 2.1 tons of gravel.
- Sand: 120 × 1 ÷ 12 = 10 cu ft = 0.37 yd³, about 0.5 tons.
Tips
- Compact the base in layers of about 2 in with a plate compactor.
- Give the patio a slight slope away from buildings so water drains, often about ¼ in per foot.
- Use the gravel and sand calculator to check bag counts for small jobs.
Calculation basis, defaults & source review
What this model calculates
Pavers = ceil(patio area ÷ paver face area × allowance). Each aggregate volume = patio area × its entered calculation depth; each mass uses its own bulk density.
Fixed assumptions and limits
- Aggregate resets: Base 1660; bedding sand 1600 kg/m³. Planning density assumptions without supplier or laboratory confirmation.
Match calculation depths and densities to the same delivered or compacted condition. CMHA nominal bedding thickness is uncompacted; no automatic compaction conversion or pavement design is supplied.
Reset inputs for comparison
These are starting values, not a prescription or a record of your current inputs. Your estimate and exported report show the values actually used. Select a matching manufacturer reference or enter exact product data where supported.
| Parameter | US reset / unit | Metric reset / unit | Status |
|---|---|---|---|
| Length | 12 ft | 4 m | Illustrative project input; not a prescribed value |
| Width | 10 ft | 3 m | Illustrative project input; not a prescribed value |
| Paver length | 8 in | 20 cm | Illustrative project input; not a prescribed value |
| Paver width | 4 in | 10 cm | Illustrative project input; not a prescribed value |
| Extra for cuts & waste | 5 % | 5 % | Illustrative project input; not a prescribed value |
| Gravel base depth | 4 in | 10 cm | Illustrative project input; not a prescribed value |
| Bedding sand depth | 1 in | 3 cm | Illustrative project input; not a prescribed value |
| Base gravel bulk density | 103.63041455640004 lb/ft³ | 1660 kg/m³ | Planning reset; use exact product data |
| Bedding sand bulk density | 99.88473692183136 lb/ft³ | 1600 kg/m³ | Planning reset; use exact product data |
Evidence and applicability
- CMHA Construction of Interlocking Concrete Pavements — PAV-TEC-002-22 (2022). Installation context, including nominal 1 in / 25 mm uncompacted bedding. It does not validate a universal base depth or density. Review status: primary indexed text reviewed; direct automated fetch may fail.
- NIST — revised unit conversion factors — International foot definitions; web reference checked 22 October 2026. Unit definitions and conversion factors only; not material density or product coverage. Review status: primary content reviewed.
Arithmetic, model and source-scope review: 22 October 2026. Indexed-only or access-limited sources are identified explicitly. Review does not verify your measurements, every product or every possible input. Independent professional engineering approval has not been obtained.
Sources and technical limitations
CMHA's construction guidance provides layer and installation context. It is not evidence for a single density, universal base depth or load capacity for every patio or driveway.
- CMHA Construction of Interlocking Concrete Pavements — PAV-TEC-002-22 (2022)
Installation context, including nominal 1 in / 25 mm uncompacted bedding. It does not validate a universal base depth or density. Review: primary indexed text reviewed; direct automated fetch may fail.
- NIST — revised unit conversion factors — International foot definitions; web reference checked 22 October 2026
Unit definitions and conversion factors only; not material density or product coverage. Review: primary content reviewed.
Frequently asked questions
How many 4 × 8 pavers are in a square foot?
A 4 × 8 in paver covers 32 square inches, so there are 144 ÷ 32 = 4.5 pavers per square foot before waste.
How deep should the gravel base be for pavers?
Patios and walkways commonly use 4–6 in of compacted gravel, and driveways 8–12 in. Clay soils and cold climates need the deeper end of the range.
How much sand do I need under pavers?
About 1 in of bedding sand. For 100 sq ft that is about 8.3 cu ft, or roughly 0.3 cubic yards.
How much extra should I order for herringbone pavers?
Herringbone and diagonal patterns need more cuts, so 10–15% extra is common, compared with about 5% for straight layouts.